MGM The Signature's Hotel Scent? Volupta

MGM The Signature's Hotel Scent, Volupta, features bold masculine floral blend with top notes of Mandarin Essence, Neroli, Orange Zest; mid notes of Champaca Flowers, White Spice Accord, Patchouli Blooms; and base notes of Benzoin Siam, Cade Oil, White Patchouli.

Ingredients: Mandarin, Orange, Neroli, Champca Flower, Patchouli, Benzoin, Cade
 
MGM The Signature's Hotel Scent - Volupta: In Fragrance Oils, Room Sprays, Reed Diffusers, Candles and Scent Machines.
 
MGM The Signature
The Signature at MGM Grand is a condo-hotel at the MGM Grand Las Vegas resort, in Paradise, Nevada, near the Las Vegas Strip. It was built by a partnership between MGM Mirage and Turnberry Associates on the location of the former MGM Grand Adventures Theme Park, although it officially holds an off-Strip address of 145 East Harmon Avenue. It features three identical 38-story towers, each consisting of 576 fully furnished units. Part of the property was previously occupied by the MGM Grand Adventures Theme Park, which was built just northeast of the MGM Grand resort; both opened in 1993. On December 5, 2002, MGM Mirage announced that it had partnered with Turnberry Associates to build a condominium and hotel complex on the property, following the closure of the theme park earlier that year. The project was part of an ongoing trend to build luxury condominiums in Las Vegas. Turnberry had previously developed the Turnberry Place condominium project, also located near the Las Vegas Strip. Unit sales for the condo-hotel project, known then as The Residences at MGM Grand, began in early 2004. The property could accommodate up to six towers, and the ultimate number of towers was dependent on sales. A total of three towers was ultimately decided upon. Construction of the first tower was underway later in 2004, near the corner of Harmon Avenue and Koval Lane. Construction of the second tower was expected to begin in early 2005. Excavation for the final tower was underway in September 2005, three months earlier than initially planned. Construction began early after more than half of the tower's 576 units were sold. The first tower was topped off on October 7, 2005, and was opened in May 2006. The second tower was finished later that year, and the third was scheduled to open in July 2007. Enjoy the alluring fragrance of MGM The Signature's Hotel Scent  

 

add to cart MGM the Signature’s Hotel Scent
Trust Pilot


Shopping cart0
There are no products in the cart!
Continue shopping
0